A custom yacht takes shape in clear stages. Each one has its own decisions, risks and costs, and knowing them early makes the whole build easier to manage.
The main stages
- Concept and feasibility. Confirm the general arrangement, prepare a preliminary specification and collect budget estimates from shortlisted shipyards.
- Contract and technical lock. Sign the build contract, finalise the detailed specification and choose the classification society and flag. Structural changes become expensive after this point.
- Engineering and production design. Structural calculations, hull optimisation, electrical and hybrid integration, HVAC, AV/IT and class approval of the drawings.
- Hull and superstructure. Steel cutting, keel laying, hull and superstructure construction and the engine room installation, with regular inspections by the owner's representative.
- Interior fit-out and systems. Owner's suite, guest and crew areas, joinery and stone. The interior specification is the biggest single factor in where the final budget lands.
- Commissioning and sea trials. Harbour tests, sea trials, noise and vibration checks, class and flag certification, crew training and delivery.
A production yacht such as the 48 Hybrid follows a shorter, simpler path. Our build process page shows the full timeline for a custom yacht.